Here are some pics I captured during the whole day.
Portable Toilet for the workers (Dixi Klo)
Blocks for our basement innerwalls
Puting the water and sewage pipelines
Perimeter Insulation (BASF Styrodur Perimeterdämmung)
Light Shafts (MEA Lichschächte)
Basement windows (Kellerfenster)
Site-electricity Box
The perimeter insulation is already done.
On-site water
Closing the street
and Finished!
No comments:
Post a Comment