Water Installation Day 3 (Wasseranschluss Tag 3)

Today was not a lot. The excavation team just need to close the holes and fix the streets that they opened. I thought at first that it will be the last day of their job. Our street has been closed since Monday. But, they are there still some parts that they were asked by the water company ZMW to repair in our street, therefore, they will be coming back tomorrow.








Tuesday, March 11, 2014

Water Installation Day 2 (Wasseranschluss Tag 2)

The water installation is done this morning. The excavation team just needs to close it properly.


They made a hole that is higher than planned :( We hope that it will not give any issues later specially during winter time. We were not happy about it. But we also do not like to have two holes in the basement wall. 






Almost finished.


In the afternoon...



















Monday, March 10, 2014

Water Installation Day 1 (Wasseranschluss Tag 1)

At 7:30 am hubby went to the building site to check on the excavation team and for the water company ZMW in-charge Herr F. They talked about how and where should the water installation be as well as the distance of the water pipeline from the planned car port.

I went there at around 9:20 am and do some dämmung and checked.






In the afternoon this is what they finished...











Monday, February 10, 2014

No Date for Water Installation (Hausanschluss Wasser)

I called as early as 7:30 am to the water company here in our end. I followed-up for the water installation that we applied since September 2013. They had so many building site visits done in our end but still we do not have a fix water installation date. I understand that during winter time, it is not that easy to install it, but what I cannot understand is that, they are always excuses for this installation to not go thru. Maybe I am just frustrated but we really need water in the building site specially that our bricks will arrive (as planned) on Monday.

I am still hoping that something will happen this week but it is already Tuesday :(

Update as of Wed --- I called the earthworks company that is partnered with the water company here in our end, since we are not receiving any update from the water company. They mentioned that they do not have any supplies of asphalt to close the supposedly open hole in the street until March 1st. They can still continue the digging but then if the holes will not be closed right away, it's gonna be dirty in our neighborhood. This is frustrating... just really soooooo frustrating :(

Thursday, January 16, 2014

Water Company's Earth Excavation Partner's Visit (Wasseranschluss Tiefbauer Termin)

Today at 8:15 am, the earth excavation company partnered with the water company in our area visited the building site. We originally have a schedule of main water supply installation on Monday. After today's visit, they said that the scaffolding needs to be first dismantled so they can start digging. That is such a bad news. The scaffolding around our house was there since it was built. Originally it should have been dismantled early last month, but we never heard of any updates from ProHaus. We did not follow-up because the scaffolding is not bothering us at all. We were just waiting for the update of ProHaus when they wanted to dismantle the scaffolding.

The big question now is... if the scaffolding will be dismantled by monday. I will try to contact them tomorrow.

This morning after their visit, we drove to another kitchen store. We were again on this situation where they would like us to sign the contract right away. But that did not happen. Buying a kitchen is not so easy, and we are not in a hurry to sign a contract. We need to consider a lot of things, such as the kind of kitchen appliances we want and need. So, they made another schedule for us.

This afternoon we also got a call from our roofer that he will be coming tomorrow to install our Air-Exhaust-System or LAS (Luft-Abgas-System) in german.

Sounds like we have something really accomplished this week huh? I hope so. I really love seeing sign of progress in our house project.