Showing posts with label LAS. Show all posts
Showing posts with label LAS. Show all posts
Sunday, January 26, 2014
Sunday Work (Kleben, kleben, kleben)
It is sunday once again. Normally it is free day, family bonding time, relaxing time... not for us. This is usually our time together to work on the building site. Today we have a lot to do. I was able to help the whole morning but not in the afternoon. We closed the cutted foil from the Air exhaust system installation. I closed the hole with special tape, and hubby put-back the insulation materials. It looks easy but it is not really that easy. We need to make sure that it is properly done, so cold temperature will not get in the house in the future. I mean, it should really be properly closed.
Friday, January 17, 2014
Air Exhaust System Installation Part 1 (LAS Luft-Abgas-System Installation Teil 1)
Today the roofer arrived at around 11 am. He was able to install the part of the Air Exhaust System that should be on the roof, as well as the other three ventilation system.
Subscribe to:
Posts (Atom)