Showing posts with label Knauf Sperrgrund. Show all posts
Showing posts with label Knauf Sperrgrund. Show all posts
Sunday, August 9, 2015
Gallery Finished with Primer
Hubby finished the application of the special white Primer at our Gallery area. It is now really for the final paint.
Saturday, August 1, 2015
Gallery Area Preparation 2
Though hubby is too busy at work, he still manage to do something at the building site. he was able to start painting the walls of our Gallery with the special white Primer.
This primer is for optimum strength development and secure adhesion of mineral decorative plasters, paints, etc. It reduces absorbency and ensures optimum processing and structuring properties. Highly effective stain barrier against discolouration from the underground, such as soot or nicotine.
Sunday, July 26, 2015
Gallery Area Preparation
Hubby has a hard week behind and ahead of him at work. He drives daily to and from the office (210 km). He was totally tired when he arrives home. Though the whole past week was very tiring for him, he still managed to work at the building site and finish a lot of things. He was able to apply the Ceresit CT17 on the Gallery walls and painted it with the wall/ceiling primer. Yesterday, he worked with his dad and then I helped him the next day. It was a productive weekend. We still have a lot of things needed to accomplish and there are still a lot of things open.
Subscribe to:
Posts (Atom)