We are hoping that before the kitchen arrives, our bathroom is already finished with floorings. This is just the start of it...
Showing posts with label Bad. Show all posts
Showing posts with label Bad. Show all posts
Friday, November 20, 2015
Thursday, October 16, 2014
Our Bathtub was Delivered! (Unser Badewanne ist da!)
I was excited to receive the call of the courier. They said, our bathtub will be delivered in our house (building site) in 10 minutes. Good that hubby, hubby's dad and I were at the building site (working). It was almost 12 noon.
Hubby and his dad carried it inside and temporarily set it at the kitchen area.
Sunday, July 13, 2014
Drywall Installation Bathroom 1 (Rigips Installation Bad 1)
Last week, hubby and his dad continued to install the drywall in our bathroom. Part of the walls are now green.
Though there are still a lot of things to be done, I am a lil bit happy to see that atleast our bathroom is starting to look like it's going to be finish SOON. I think this part of the second floor is one of the hardest and longest room to be finish. It is because of all the needed installations like pipes, cables, things like shower, basin, toilet and bathtub should be in place etc.etc.
Though there are still a lot of things to be done, I am a lil bit happy to see that atleast our bathroom is starting to look like it's going to be finish SOON. I think this part of the second floor is one of the hardest and longest room to be finish. It is because of all the needed installations like pipes, cables, things like shower, basin, toilet and bathtub should be in place etc.etc.
Subscribe to:
Posts (Atom)