Start of the week --- the continuation and final installation of the sanitary systems.
The workers started their job in the beginning of the week. First day, our plumber was able to install the iBox in our bathroom, guest WC and basement bathroom. On the second day, they were able to have the water pressure test and it is good to know that all the pipes are tightly close (no leaks). On the third day, our heating specialist installed the heating distributors (Fußbodenheizungsverteiler), made a water pressure test on it and installed the provisionary toilet at the basement.
Showing posts with label Sanitärinstallation. Show all posts
Showing posts with label Sanitärinstallation. Show all posts
Thursday, August 28, 2014
Wednesday, June 18, 2014
Plumbing (Sanitärinstallation)
Last Monday the plumbers arrived. They started to install the water pipes in our Bathroom, Guest WC, Shower Room, Kitchen and Laundry Room. They worked straight 3 days. It is not fully finished though because we still have some important materials that are missing.
Subscribe to:
Posts (Atom)