Continuing installing the underfloor heating pipe even on Sundays. This time, hubby started the basement area. And since the weather was good --- it was sunny, the kids were at the garden with Grandparents. I was then able to assist hubby to place it. After finishing two rooms, we put some roof tiles on the parts that are going-up.
No comments:
Post a Comment