Below is the picture that I took after the meeting. As you can see, we still have the building site stairway. After the floor screed, ProHaus will visit us again for the measurements of our wooden stairway. The delivery will follow after eight weeks.
Tuesday, April 14, 2015
ProHaus Building Consultant Visits (ProHaus Ausbauberater Besucht)
It was a surprise that we received a call from our ProHaus Building Consultant today. He said that he is on the area and he would like (if it is possible) to see how we are doing with our house building. Ofcourse I went directly to the house and he checked how the underfloor heating pipes were installed. There are some things that needed to follow in order to avoid issues later. For example, there should be no underfloor heating pipes under the first step of the staircase and so on and so forth. Good thing that everything is all right. He also took some pictures and measures the needed distances.
Below is the picture that I took after the meeting. As you can see, we still have the building site stairway. After the floor screed, ProHaus will visit us again for the measurements of our wooden stairway. The delivery will follow after eight weeks.
Below is the picture that I took after the meeting. As you can see, we still have the building site stairway. After the floor screed, ProHaus will visit us again for the measurements of our wooden stairway. The delivery will follow after eight weeks.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment