Three weeks vacation is over. Hubby worked the whole three weeks in the house.
Last Saturday, we learned that the earth cable that was already installed from the power box to basement is wrong. So frustrating. Until now we still do not have power in the house except for the temporary building site power box. We planned to return this box in the month of January but with this issue, we cannot do that. I hope this issue will be resolved soon.
This morning, I continued the inner wall insulation. There are not a lot anymore, but these are the parts where I need to cut a lot of small pieces to fit. Therefore it took the whole morning to finish it. The only inner wall that is not yet insulated (in the whole house) is that of the Toilet in the first floor (Guest WC).