Tuesday, February 18, 2014

Bricks Installation Day 2 (Klinker Montage Tag 2)

The stress is getting more and more each day. I did not thought that bricks installation will be this stressful for me. It is the same like dealing with the an open contract, just in a different point of view. Anyway, I WISH it will be finished soon and it will give us a good result.

The bricklayer troop are working good, fast and on time. The only issue is on our end. The lower portions of the two long thin windows that we have, the terraces doors and the main entrance are still open or not yet installed with bricks.




At noon time, this is how it looks like...





In the afternoon...







No comments:

Post a Comment