Tuesday, September 30, 2014
Applying Penetrating Primer on the Walls (Anwendung Tiefgrund Lösemittelfrei auf die Wände)
Hubby's dad taught me how to apply the penetrating primer on the walls. I started doing it on the chimney located in our second floor. After that, I started to apply it on our pantry.
Monday, September 29, 2014
Remaining Insulation Materials (Dämmung)
I thought I was finished installating insulation materials. When we checked on our bathroom upstairs, our Guest Toilet and part of our Kitchen, I still need to install some of it. Ok... then... achooooo! (sneezzzz).
I also cleaned-up the whole place.
I wrote markings where the beams are, in preparation for hubby's ceiling substructure installation.
I also cleaned-up the whole place.
I wrote markings where the beams are, in preparation for hubby's ceiling substructure installation.
Sunday, September 28, 2014
Weekend Building Site Work (Arbeit auf der Baustelle - Wochende)
Hubby worked mostly alone at the building site this weekend.
His dad helped him last Saturday to install the ceiling substructure and drywall at the lobby. Though the week was hard at hubby's work, he was still able to wake-up early Saturday to work in our house.
His dad helped him last Saturday to install the ceiling substructure and drywall at the lobby. Though the week was hard at hubby's work, he was still able to wake-up early Saturday to work in our house.
The rest of the work below were done by hubby alone. Aside from that, he also fix all the cables in our dinning and living room.
Planking with wood-based panel.
Drywall installation at the iron portion of our kitchen ceiling.
Drywall installation on the kitchen wall.
Friday, September 26, 2014
Vapor Retarder Installation Guest Toilet and Lobby Tape Up (Dampfbremsefolie Installation Gäste WC und Diele Verkleben)
Today I was able to finish taping-up the vapor retarder in our office room, guest toilet and the remaining part of the lobby. It took me the whole morning to finish it. It is because there were parts where it is not that easy to make sure that there's no hole on it (like for example, where the cables are passing-thru as well as the corners of each room).
I am happy though that I was able to do a lot this week and the whole house is now BLUE (because of vapor retarder). Hopefully it will soon be WHITE (drywall).
I am happy though that I was able to do a lot this week and the whole house is now BLUE (because of vapor retarder). Hopefully it will soon be WHITE (drywall).
From the last picture above, I didn't close one corner of this room yet, because hubby still needs to check on the cables running-thru it.
Thursday, September 25, 2014
Vapor Retarder Installation Guest Toilet and Lobby (Dampfbremsefolie Installation Gäste WC und Diele)
Today I was able to install the vapor retarder in our Guest Toilet and the remaining part on the lobby.
Wednesday, September 24, 2014
Vapor Retarder Installation Office Room (Dampfbremsefolie Installation Arbeitszimmer)
Today I was able to finished the installation of insulation materials in the whole house (except for the attic area). That part is not crucial for finishing the house :)
Since the insulation materials were all done, I was able to install the vapor retarder at the Office Room. It was tough to install it smoothly due to the heavy weight of the insulation materials. But it will look different as soon as the ceiling substructure will be installed.
Since the insulation materials were all done, I was able to install the vapor retarder at the Office Room. It was tough to install it smoothly due to the heavy weight of the insulation materials. But it will look different as soon as the ceiling substructure will be installed.
Tuesday, September 23, 2014
Filling-up Chimney's Side with Cement
Hubby's dad filled-up the sides of the chimney with cement today.
He also installed the drywall in our kitchen window.
I was able to finish the vapor retarder installation today. I also installed the remaining insulation materials for the kitchen ceiling and walls. Aside from that, I also started doing the Office Room.
Hubby's dad already installed the drywall around our chimney on the second floor.
He also installed the drywall in our kitchen window.
I was able to finish the vapor retarder installation today. I also installed the remaining insulation materials for the kitchen ceiling and walls. Aside from that, I also started doing the Office Room.
Hubby's dad already installed the drywall around our chimney on the second floor.
Subscribe to: