Wednesday, September 24, 2014

Vapor Retarder Installation Office Room (Dampfbremsefolie Installation Arbeitszimmer)

Today I was able to finished the installation of insulation materials in the whole house (except for the attic area). That part is not crucial for finishing the house :)

Since the insulation materials were all done, I was able to install the vapor retarder at the Office Room. It was tough to install it smoothly due to the heavy weight of the insulation materials. But it will look different as soon as the ceiling substructure will be installed.



No comments:

Post a Comment