Thursday, July 31, 2014
Vapor Retarder Installation at the Dinning Room's Wall (Dampfbremseanbringen Essbereich Wände)
In the afternoon, I was able to go to the building site for at least an hour and a half. While hubby's dad worked in the second floor, I continued the installation of the vapor retarder on the walls of the dinning room. Before I stopped working, I was able to finish the part in between the two small long windows.
Sanding Sanding Sanding (Schleifen Schleifen Schleifen)
Since hubby needs to work out-of-town, last Wednesday hubby's dad and I cleaned-up the building-site in the morning and in the afternoon hubby's dad worked on the second floor.
Yesterday morning, hubby's dad and I went to the building site --- I sanded the walls using a small machine and he did the next batch of filling paste on the walls and ceiling. In the afternoon, I went there for an hour to organize the ground floor and clean-up.
This morning, we (hubby's dad and I) worked again at the building site. Hubby's dad continued sanding using the bigger machine in the second floor. I continued installing the insulation materials on the ground floor. In between times, I also helped him sanding the walls.
Yesterday morning, hubby's dad and I went to the building site --- I sanded the walls using a small machine and he did the next batch of filling paste on the walls and ceiling. In the afternoon, I went there for an hour to organize the ground floor and clean-up.
This morning, we (hubby's dad and I) worked again at the building site. Hubby's dad continued sanding using the bigger machine in the second floor. I continued installing the insulation materials on the ground floor. In between times, I also helped him sanding the walls.
Sunday, July 27, 2014
Vapor Retarder Installation Dinning Room and Lobby (Dampfbremse anbringen Essbereich und Diele )
Today, I worked the whole day to double the ceiling insulation in our dinning room and lobby. After that, I was then able to finally install the vapor retarder. As suggested by ProHaus, we just need insulation material of 100 for the ceiling, except on the part near our walls (in the whole house) which should be in 240. But since we have extra insulation materials, we then decided to double it.
After installing the vapor retarder, now the dinning room and lobby looks blue!!! Something new in our ground floor. Unfortunately, hubby's vacation is over... therefore we need to wait for the weekend to install the ceiling substructure.
After installing the vapor retarder, now the dinning room and lobby looks blue!!! Something new in our ground floor. Unfortunately, hubby's vacation is over... therefore we need to wait for the weekend to install the ceiling substructure.
Friday, July 25, 2014
Electric Installation (Elektro Installation)
Electric installation is one of the most time-consuming work in our house. Hubby is doing all the cabling. I am documenting where the cables pass-thru and we are both deciding where the sockets, switch etc. should be. We also hired an Electrician who is once in awhile at the building site to help, as well as to give his professional suggestions.
It is not easy, since we really need to think about all the possible needs for switches and sockets. For instance, how many switches/sockets do we need in each room, in the bathroom, in our living and dinning room and of course in the kitchen. Electric plans is so connected to how we would like the room to be designed or arranged. For example, we need to have a final plan for kitchen in order to know where the sockets will be installed. We also need to know if we want to use spots instead of simple ceiling lamp.
Today, hubby continued to work on cables and the Electrician worked on finalizing and checking if all the sockets in our second floor works fine.
It is not easy, since we really need to think about all the possible needs for switches and sockets. For instance, how many switches/sockets do we need in each room, in the bathroom, in our living and dinning room and of course in the kitchen. Electric plans is so connected to how we would like the room to be designed or arranged. For example, we need to have a final plan for kitchen in order to know where the sockets will be installed. We also need to know if we want to use spots instead of simple ceiling lamp.
Today, hubby continued to work on cables and the Electrician worked on finalizing and checking if all the sockets in our second floor works fine.
Thursday, July 24, 2014
Planking with Wood-based Panels Living Room (Beplankung der Innenwand Wohnzimmer)
Hubby continued to plank the wood-based panels in our living room. His goal before his three weeks vacation ends is to see progress on the ground floor. Unfortunately, he worked alone most of the times. That is not enough to at least see a big difference on the ground floor.
Our birthday boy was all day working on the building site today. I brought him breakfast in bed this morning to celebrate his special day. The kids and I woked him up singing Happy Birthday. We ate good lunch at home and had tea time in the afternoon. BUT--- most of the time, he was working on our house. I wish and pray that on his next birthday, we are already celebrating it inside our very own house.
Our birthday boy was all day working on the building site today. I brought him breakfast in bed this morning to celebrate his special day. The kids and I woked him up singing Happy Birthday. We ate good lunch at home and had tea time in the afternoon. BUT--- most of the time, he was working on our house. I wish and pray that on his next birthday, we are already celebrating it inside our very own house.
Wednesday, July 23, 2014
Visit of ProHaus Building Consultant (Besuch von ProHaus Ausbauberater)
Our ProHaus Building Consultant visited today late afternoon. He answered all our questions and checked if everything is all right. We also mentioned all the opened issues in our end and he eagerly gave answers for it. It is interesting to know that before our leveling screed arrives, we need to accomplish a lot of things and we need to make sure that everything is being followed. I wish and pray that we will get that before Fall season.
Monday, July 21, 2014
Laying of Rain Water Pipes (Regenwasserohren Verlegen)
This morning, hubby and his dad continued the work in our bathroom.
In the afternoon, hubby, his dad and a helper laid the rain water pipes. Unfortunately, hubby found out that two big pipes were defective. I called ProHaus right away to asked for replacement. Since the pipes were long, there will be an issue on the delivery costs. They can deliver it to us though, when the customer service team visits us (regarding the other open small issues that we have). Because of that, we will not be able to finish installing all the rain water pipes around the house. But at least it looks almost finish.
In the afternoon, hubby, his dad and a helper laid the rain water pipes. Unfortunately, hubby found out that two big pipes were defective. I called ProHaus right away to asked for replacement. Since the pipes were long, there will be an issue on the delivery costs. They can deliver it to us though, when the customer service team visits us (regarding the other open small issues that we have). Because of that, we will not be able to finish installing all the rain water pipes around the house. But at least it looks almost finish.