In the afternoon, I was able to go to the building site for at least an hour and a half. While hubby's dad worked in the second floor, I continued the installation of the vapor retarder on the walls of the dinning room. Before I stopped working, I was able to finish the part in between the two small long windows.
No comments:
Post a Comment