Sunday, August 17, 2014

Drywall Installation Pantry Part 1 (Rigips Installation Vorratskammer Teil 1)

I was only able to work at the building site, in the morning. I marked all the light switches and sockets. After that, hubby made the holes.


In the afternoon, hubby started to install the drywall at the Pantry.


I was able to visit the building site with the kids in the afternoon. They were excited to help their dad =)





No comments:

Post a Comment