Today is the scheduled day for the building materials to arrive. It was normally scheduled Oct. 29-30, few days after building the house. But we requested ProHaus to move it to Nov. 4-5 because hubbby was in out-of-town project.

The first delivery truck arrived at 9:30 am. It delivered the materials such as the chipboard (spanplatten), electric materials, window ledges, and materials needed for the outside wall of the house (fassadenzubehör). The second truck arrived around 2:20 pm. It delivered the Insulation materials.

On the first truck hubby and his friend Kai, carried all the heavy materials... and I helped with the small and not heavy ones. On the second truck, it was hubby and I who were left on the building site, and he carried most of the insulations materials *sigh* It was heavy! I helped him, but only with the ones that are 160mm thick rolls. But the rest, he carried it alone inside the house with a bad weather at that... RAINING! It was indeed a hard day for hubby, therefore he deserves a warm tomato soup :)










No comments:

Post a Comment