In the afternoon, I went to the building site and it looks totally different. I suddenly felt the excitement. On the front side, the pit is already 3/4 filled-up. I just miss seeing the Opti-Control Schacht in every corner. I hope it is not too late to tell them that we should have that.
Autumn. Fall. Building Site.
Update: Today (18.10.13) the two out of three light wells were installed, and the pit is filled-up. It is not yet fully filled-up, bcoz they will finish it after the house is build. This is how it looks now...
No comments:
Post a Comment