Saturday, the electrician was at the building site do to some work at the basement. While he was working there, hubby worked on some electrical cables at the ground floor. Hubby finalized it last Sunday, so I can already install the vapor retarder this week.
Sunday, September 21, 2014
Friday, September 19, 2014
Sanding Ground Floor Lobby (Schleifen EG Diele)
Hubby's dad and I do the sanding in the ground floor lobby. I sanded the walls using a small machine and he did the next batch of filling paste on the walls and ceiling.
Monday, September 15, 2014
Drywall Installation Lobby Final (Rigips Installation Diele Finale)
Today one helper worked on the lobby part of our house. He installed the remaining drywall/plasterboard that we asked him to install and he also filled-in the plasterboard. Just a few plasterboard to install and our lobby area will be finish.
Saturday, September 13, 2014
Drywall Installation Lobby (Rigips Installation Diele)
Hubby and his dad installed some drywall in our lobby and one wall of our wardrobe corner. The rest of the work will be done by a helper this coming Monday.
Friday, September 12, 2014
Planking with Wood-based Panels Kitchen (Beplankung der Außen/Innenwand Küche)
Hubby planked the kitchen with wood-based panels.
This past week, hubby had his vacation leave at work. We used the whole week to finish lots of building works in our house. Hubby and I started early in the morning to finish our goal at the building site.
Now, vacation week is over. We were happy to see that the groundfloor looks promising. We are hoping to have our floor screed before winter comes or at least before the year ends. There are still pile of works that needs to be done.
Some part was left undone because our electrician needs to install electrical cables on it.
Now, vacation week is over. We were happy to see that the groundfloor looks promising. We are hoping to have our floor screed before winter comes or at least before the year ends. There are still pile of works that needs to be done.
Insulation Material Installation Kitchen Walls (Dämmung Installation Küche)
After the electrical cables were in place, I was then able to re-install the insulation materials in our kitchen walls.
Thursday, September 11, 2014
Electrical Cable Installation Kitchen (Elektroinstallation Küche)
Hubby started and finished the electrical cable installation in our kitchen this week. That was one big goal achieved (*Kudos to you, my love*). Because of that, he was as well able to close the walls with wood-based panels.
This part of the electrical cable installation was not easy in such a way, that we need to first decide how our kitchen should look like (Final Kitchen Plan) and where the sockets should be (sockets for the oven, stove, cooker hoods, dishwasher and other elektrical kitchen devices). It should all fit.
This part of the electrical cable installation was not easy in such a way, that we need to first decide how our kitchen should look like (Final Kitchen Plan) and where the sockets should be (sockets for the oven, stove, cooker hoods, dishwasher and other elektrical kitchen devices). It should all fit.