Hubby and his dad started to install the drywall in our bathroom. There are still a lot to do.
Monday, June 30, 2014
Sunday, June 29, 2014
Vapor Retarder Installation Office Room, Guest WC and Bathroom (Dampfbremse anbringen Arbeitszimmer, Gäste WC u. Bad )
Another vapor retarder installation work for our house. I was able to finish the Guest WC, then one wall of the Office Room and continued in the bathroom.
Monday, June 23, 2014
Planking with Wood-based Panels Office Room (Beplankung der Innenwand Arbeitszimmer)
Hubby finished alone the outside wall of the Office Room and Guest WC. This part was not easy because the wood-based panels were divided into three parts. It should perfectly fit or else it will not work. The next work here is to install the vapor retarder then drywall installation.
Drywall Installation Room 3-1 (Rigips Installation Zimmer 3-1)
Hubby and his dad started the drywall installation in the third room. We are almost finished on the second floor and it really looks different. After this room, hubby needs to work on the bathroom and this floor is finished.
Sunday, June 22, 2014
Vapor Retarder Installation (Dampfbremse anbringen)
Today I finished the installation of vapor retarder in our Bathroom, Parent's Room, in our Galery and wardrobe area.
Thursday, June 19, 2014
Planking with Wood-based Panels Galery (Beplankung der Innenwand Galerie)
Hubby worked in the building site and continued planking the Galery, Parents' Room and Bathroom with wood-based panels. He also continued installing the electric cable and preparing the holes for the sockets and etc.
Wednesday, June 18, 2014
Plumbing (Sanitärinstallation)
Last Monday the plumbers arrived. They started to install the water pipes in our Bathroom, Guest WC, Shower Room, Kitchen and Laundry Room. They worked straight 3 days. It is not fully finished though because we still have some important materials that are missing.