Monday, September 23, 2013

Basement Building Day 4 (Kellerbau Tag 4)

It is not much today, just the basement inner walls...



Our future extra shower room

Our future washroom.



Our future office room, with two big windows.


The view facing the basement floor.

Thursday, September 19, 2013

Basement Building Day 3 (Kellerbau Tag 3)

Today I went to the building site around 10:20am to receive the delivery of the Perimeter Insulation materials. And this is how it looks like there:

Street is closed...because no one can pass thru these big trucks.





Basement Perimeter Insulation - Jackodur.














Wednesday, September 18, 2013

Basement Building Day 2 (Kellerbau Tag 2)

At around 7:30 am I was already on the building lot. The crane is already parked but the truck with our basement walls is still on its way. The Gussek & Wolts people were already working since 7am. The weather is not so good today, because it is raining... not hard, but still raining. I hope the sun will show up today. But.. based on the Weather forecast, the next day that the sun will come out is next week - Monday.





The truck with our basement walls. 
Good that it is not raining anymore.

This is how it looks like when I returned around 9:15 am


One of the basement windows' frame was already installed, when I came back. We actually take it out of from our contract. I talked with the Foreman (Polier) and then he said it is no problem to uninstall it. We took out this window because it is not a tilt-and-turn window (Dreh-kipp).










Our basement door, facing the garden.


Our lucky number :)







The basement ceiling (Kellerdecke)


They started to do the inside wall in the afternoon