Monday, August 31, 2015

Easyputz in Galery

Hubby finished painting our Galery with Easyputz. It is now done and we are just waiting for the schedule of the Tile Setter.







Before that, I also first do the Ceresit CT17 on the groundfloor of our basement. This is used to protect the groundfloor.



Base Sealing Ceresit BT 21

Hubby's dad and I scrapped the excess parts of the Base Sealing (Ceresit BT 21). We need to only have atleast 3 to 4 cm over the edges, so that our outside wall plaster will be done soon.

Hubby and I installed these Base Sealing almost two years ago. We thought that making it longer protects more the edges of the house. Actually it did. Unfortunately, we need to cut it out to 4 cm from the edge . It is because the wall plaster have no possibility to hold with the Base Sealing.

Saturday, August 22, 2015

Backyard, Frontyard and Garden Landscape

One of the updates regarding our House Building is the Backyard. In the beginning, we plan to have an even ground for things like Trampoline for kids or next summer a big swimming pool for us. But since our place is located on a hillside, we will never get the perfect leveled ground.

Anyway, after the earthworks company finished the job, I started to cultivate and even-out the place. We thought of buying another batch of topsoil but then it was a bit expensive. And if it will just delivered then it will be the same work that I have in mind.

Our backyard's topsoil is in my opinion good enough to have our bermuda grass to grow. We just need to hurry-up before the weeds grow. It has been raining and the Autumn weather is already starting to say hello.











Sunday, August 9, 2015

Gallery Finished with Primer

Hubby finished the application of the special white Primer at our Gallery area. It is now really for the final paint.






Friday, August 7, 2015

Garden Landscape (Day 2)

The earthworks company people ended the work yesterday early as planned. The weather was so hot. It is better to start early in the morning and end early in the afternoon, if the weather is too hot. Therefore, they started the work today at 6:30 am. Today was also a hot weather, so they ended the work at 12:20.





Thursday, August 6, 2015

Garden Landscape Started (Day 1)

At last our earthworks company arrived this morning at around 7am. They brought one 9 Ton excavator. The big basalt stones arrived around 10 am. It will be placed as a support at the Carport area.










 

Tuesday, August 4, 2015

Primer Second Time Application at the Living, Dinning and Kitchen Area

I was able to ask my Parents-in-law to take care of my kiddos for awhile so I can do something at the building site. I was able to do the second and final application of the Primer at the Living, Dinning and Kitchen area. This is a pre-requisite so that the wallpaper can be installed.



Saturday, August 1, 2015

Gallery Area Preparation 2

Though hubby is too busy at work, he still manage to do something at the building site. he was able to start painting the walls of our Gallery with the special white Primer.

This primer is for optimum strength development and secure adhesion of mineral decorative plasters, paints, etc. It reduces absorbency and ensures optimum processing and structuring properties. Highly effective stain barrier against discolouration from the underground, such as soot or nicotine.