Wednesday, October 2, 2013

Foundation/Structural Architect's Report or Acceptance Report (Abnahmebericht Gründung)

We have a meeting with Architect G. today at around 1 PM for the inspection of the basement. 

The acceptance report is prerequisite for the construction of the house. It is checked if the basement has the correct dimensions and whether the height differences are within the permissible tolerance range. Furthermore, all the remaining conditions are also checked like whether the pit is filled correctly (which on our case is not yet done, but soon), the site power or electricity is available, the water-on-site is available, if there is enough space for the crane and the frame is available, etc. etc.

The inspection took only 45 min all-in-all including the signing of papers. As far as the inspection of the keller is concern, as well as the things needed for building the house, everything's OK. That is good to know.