Sunday, July 13, 2014

Drywall Installation Bathroom 1 (Rigips Installation Bad 1)

Last week, hubby and his dad continued to install the drywall in our bathroom. Part of the walls are now green.


Though there are still a lot of things to be done, I am a lil bit happy to see that atleast our bathroom is starting to look like it's going to be finish SOON. I think this part of the second floor is one of the hardest and longest room to be finish. It is because of all the needed installations like pipes, cables, things like shower, basin, toilet and bathtub should be in place etc.etc.

No comments:

Post a Comment