Wednesday, August 14, 2013

Meeting with Gussek and Wolts Kellerbau

Today at 2pm, we met Herr Z. from Gussek und Wolts Kellerbau. He checked the location of the land, double-checked the channel height and then answered our questions regarding basement building. We learned today that as per plan, and if everything goes well with the bank loan, our basement will be build on week 38 (16-22 of September). He also mentioned that the earthworks should be done a week before that. Whew! that is only in five weeks. Everything is getting so fast.

BUT... as mentioned above, only if the bank loan will be approved and if the building permit will arrive. For those two important things, all we can do is WAIT!

For the moment, we are busy fixing the small details about our basement plan (like the basement door, windows, etc.) and our houseplan (type and color of the roof, asking about changing the color of the stairways, and etc). We also need to contact our CAD Ms. K for the basement door and windows actual measurement.

I would say, house building is a stressful project. Not only for preparing the things, putting yourself into big financial obligations, getting into the smallest details, one of the most important thing is... for the work that is waiting for us. But... this is our dream... to have our very own dream house.

No comments:

Post a Comment